ASSR is an open access journal, aims at rapid publication of concise research papers of a broad interest in Physical education fields. Subject areas include all the current fields of interest represented by the Committees of the Design Scientific Renaissance. ASSR welcomes papers and articles in sport and physical education, fields of ASSR includes but not limited to: sport for all; Exercise physiology; Moths of training and coaching;Sport’s performance and analysis
JACSTR is an open access journal, aims at rapid publication of concise research papers of a broad interest in computer science and information technology fields.
JALOR aims at rapid publication of concise research papers of a broad interest in laser and optics fields. Subject areas include all the current fields of interest represented by the Committees of the Design Scientific Renaissance. JALOR accepts papers and articles in fields, including but not limited to the following: Actuator; Detectors; Ferroelectric And Ferromagnetic Materials; Filters; Holography; Laser Accessories And Optics
Journal of Advanced Medical Research (JAMR) is an open access journal, provides rapid publication of various articles in the fields of Medical, Dentistry, Pharmacy, Comparative Veterinary and Medical sciences, and related disciplines. JAMR seeks to publish experimental and theoretical research results of outstanding significance in the form of original articles, reviews, case reports, short reports, or letters to the editor.
JASER is an open access journal, aims at rapid publication of concise research papers of a broad interest in science and engineering fields. Subject areas include all the current fields of interest represented by the Committees of the Design Scientific Renaissance.
JMMR aims at rapid publication of concise research papers of a broad interest in marketing fields. JMMR welcomes papers and articles in marketing fields, including but not limited to the following: Consumer behavior; CRM; Customer Knowledge Management; Advertising economies; Consumer modeling; Marketing research; Interactive marke
The Journal of Purity, Utility Reaction & ENVIRONMENT focuses upon six aspects of chemical engineering: chemical reaction engineering, environment chemical engineering, and materials synthesis and processing, catalyst surface reaction, optimization and control.
Construction Bidding System Recommendations
by Mireya Lechuga (2020-08-01)
When a project is open to bids (whether the bid is for the entire project or simply a portion of it), contractors and sub-contractors are provided with basic information regarding the project's specifications. With this information on hand, contractors can begin to put together a proposal (produced from their experiences) to outline what they believe will be the bottom line cost. Open DV bidding registration allows contractors to find out what competitors are offering - to the specific extent - while closed bidding prevents favoritism and underbidding from taking place.
Focusing on how to bid on a construction job defines a thin line between success and failure. If you have the fortune of owners accepting your bids frequently, it is a wonderful thing. But if you are continually underestimating your bid and what costs would actually factor in to the job you might be on the fast train to bankruptcy.
As well, if you (the contractor) continually manipulate bids to be the minimum of those bids submitted, legal penalties might be imposed if it really is found you are guilty of lying - for the sole purpose of the good thing about outbidding competitors. What isn't illegal is to underbid a project by underestimating rising material costs or incorrectly accounting for delays which could extend the time to complete the job.
As mentioned within the opening: the minimum bid doesn't always win, but rather the bid that is believed to be the most realistic will often rise to the top. When bids are submitted, a construction bid template is used. A bid template is an official document that binds the bid to a legal agreement - if the bid does end up being the winner. On this bid template lists the bottom-line factor: cost, but other reasons included often play a part in deciding a winner. Experience often will be essential in the final decision and additionally the method through which the design (of the architect) is built.